New Jersey Electrical License 12067

PO Box 157
Butler, NJ 07405
Phone:  (973) 283-8927
Fax:  (973) 283-4451
PROJECTS
Return to this page
for future updates
Znak Inc. is equipped to handle projects of any size.  Our completed project amounts
range from $10 (service, troubleshooting, etc..) to multi-million dollar projects.  These
are just a few of our clients*
(Links will open in new window):
*Please contact us if you wish to obtain a more comprehensive client listing.
Updated - 3/25/08


Project Summary:

Completed lighting retrofit work at The William G. Mennen Sports Arena,Morristown, NJ.  The work
consisted of replacing the existing Metal Halide fixtures with new energy efficient fluorescent T5HO
lights in Rink 3.  This project resulted in large utility savings for the client as well as a clean, white
light that better illuminates the rink as opposed to the stale, yellow one that preceded it.
Updated - 6/5/08


Project Summary:

Called in to the Freeport McMoran factory in Elizabeth, New Jersey due to the production line
process constantly being interrupted because of unwanted circuit breaker trips.  Engineering
production line specialists were unable to detect this problem, but for a fraction of their
troubleshooting price we were able to not only identify the solution but make the necessary repairs
to ensure the system’s proper operation.  Afterwards we recommended solutions to improve the
plant’s safety systems, process reliability and cost efficiency.  This project demonstrates our
company’s ability to diagnose and repair highly technical problems; a quality that constantly sets
us apart from the competition.
*NEW* Updated - 8/21/08


Project Summary:

Completed new electrical wiring at the Starbucks store in Livingston, NJ.  Performed sight lighting
troubleshooting and repair at the
Hampton Inn in Harrison, NJ.  Completed lighting repair work at
the
Stelron Components facility in Mahwah, NJ.  Designed a lighting retrofit package for the Stelron
Company, with the purpose of providing better lighting and saving on energy costs.  The estimated
time for the energy savings to pay off the installation costs for this project is 1.5 years.